Banner

SpaceX and Tesla committed $16.8 billion to build Terafab, a chip plant in Grimes County, Texas. Starlink passed 13 million broadband subscribers and 22 million monthly mobile users. Starship Flight 14 targets an operational Starlink V3 deployment. An Experienced Industry Correspondent says Neutron's first flight at mid-2027 on Rocket Lab's development record.

We are live on X this week at 11 AM EST. Follow us on X here.

Tomorrow we release the AI Compute Keystone Model, the first in our Keystone series. Premium members get the full model of the compute market, download files and a guide to putting them to work; alongside it we publish a free public brief telling the high-level story the model currently tells. The model runs on 374 documented assumptions and simulates 5,000 futures of the compute market through 2040, terrestrial and orbital together, in what is to our knowledge the only compute-market forecast with orbital capacity integrated. The full analysis is exclusive to Mach33 Premium Research members, but the introduction and executive summary are free to read.

Latest Analysis
Featured chart thumbnail
Aug 12, 2026
AI Compute Keystone Model: How much infrastructure is built, and where?
Compute DemandOrbital Data Centers

We modeled the AI compute market from 2026 to 2040 as one connected system: what a delivered unit of compute costs by build route, how demand responds as prices fall, and where new capacity actually gets built. The model treats orbital datacenters as a build route inside the same framework as terrestrial, tests every assumption across its full range, and stress-tests the story under thousands of simulated futures. This Premium article is a presentation of the key takeaways.

Read More →
SpaceX's First Earnings, the Nvidia Starmind AI1 Deal, and Supercomputers On and Off Earth| Episode #14
Aug 6, 2026
SpaceX's First Earnings, the Nvidia Starmind AI1 Deal, and Supercomputers On and Off Earth| Episode #14
NVIDIAAI ChipsSpaceXEarnings

SpaceX's first earnings as a public company came in above consensus, with the AI segment flipping from an EBITDA loss to a sizable profit and guidance pointing from roughly $2 billion a month to $8 billion or more. The episode also covers the co-designed Nvidia rack built to run on the ground or in orbit, a rumored 130,000 acre Louisiana site for Starship, and Gwynne's first public confirmation that Starlink's direct-to-cell service will lean on terrestrial hardware.

Read More →
Industry News
Neutron now Expected in Mid-2027
Aug 11, 2026
Neutron now Expected in Mid-2027
Rocket Labneutron

Eric Berger (Ars Technica senior space editor) says Neutron represents "a big step up from Electron" and that investors should set Neutron launch expectations at mid-2027 at the earliest, citing a pattern of prior issues with the program.

Read More →
Starlink Passes 13 Million Broadband Subscribers and 22 Million Monthly Mobile Users
Aug 11, 2026
Starlink Passes 13 Million Broadband Subscribers and 22 Million Monthly Mobile Users
StarlinkSpaceX

Elon Musk said that Starlink has passed 13 million broadband subscribers across 167 countries, in a 29-minute recording SpaceX then posted publicly on X. He put Starlink Mobile at more than 22 million monthly users reached through 36 mobile network operators, with nearly 11,000 satellites in orbit.

Read More →
Starship Flight 14 Will Target First Operational Starlink V3 Deployment
Aug 10, 2026
Starship Flight 14 Will Target First Operational Starlink V3 Deployment
SpaceXLaunchstarlink v3

Starship Flight 14, due end of August, is expected to be the vehicle's first operational payload deployment mission. Unlike Flight 13, which deployed 20 functional V3 satellites on a suborbital trajectory for testing before they reentered, this mission aims to place the next-generation satellites into orbits where they can join the active Starlink constellation.

The flight is also expected to attempt the first tower catch of a Starship upper stage (the Ship). Spaceflight trackers have pointed to a new FCC filing for Flight 14 that lists the first-stage booster as returning to the launch site (RTLS) rather than a Gulf splashdown. This has led to speculation that SpaceX could attempt a double catch, booster first (returning ~7 minutes after liftoff), then the Ship after its orbital flight (~90+ minutes later), using the same Mechazilla arms on the Pad B tower, with the booster moved aside in between. 

Read More →
SpaceX and Tesla Commit $16.8B To Build Terafab Chip Plant In Grimes County Texas
Aug 6, 2026
SpaceX and Tesla Commit $16.8B To Build Terafab Chip Plant In Grimes County Texas
TerafabSpaceXTesla

SpaceX and Tesla announced a joint $16.8 billion first-phase investment in Terafab, a 100-million-square-foot semiconductor fabrication plant in Grimes County, Texas, creating 3,000 jobs. Texas extended a $30 million Texas Enterprise Fund grant and JETI tax incentives to secure the project.

Read More →
Mach33
The Space Finance Group