|
|
SpaceX announced a $100 billion launch campus at Pecan Island in Vermilion Parish, Louisiana, five launch complexes with two pads each, with construction from 2027 and first launches as soon as 2029; the site plan carries its own propellant production and power generation, which is what thousands of launches a year actually requires. SpaceX adopted Nvidia's Vera CPU for Starmind, the processor side of the Vera Rubin platform its orbit-optimized AI1 payload is already built on. Anthropic is preparing an IPO aimed at SpaceX's $86.2 billion record along a possible $30 Trillion total addressable market. SpaceX flew the last planned Falcon 9 Starlink mission from Florida on August 25, 29 satellites from Space Launch Complex 40, with Florida Starlink handing off to Starship and Vandenberg staying on Falcon 9.
We are live on X this week at 11 AM EST. Follow us on X here.
This week's analysis, "SpaceX Louisiana: On-Site Propellant Becomes Necessary at Scale," prices what an on-site fuel plant replaces. Trucked propellant costs far more per flight than propellant made where it is burned, but the real constraint is physical: each flight draws a long queue of cryogenic tankers, and at the cadence SpaceX is building toward those arrivals run near-continuous, leaving no slack for weather or a missed delivery. Merchant supply stops being plausible just above the cadence Starbase is already approved for. Payback follows cadence, not construction cost.
We redesigned research.33fg.com this week. Same research, a cleaner site to read it on. Respond and let us know what you think!
BIG NEWS, We are opening a beta of the MACH33 MCP to our premium and pro subs, which connects the research archive directly to Grok, Claude, and other models. No more searching our site for content our models just ask your agent somethin like
"What quantitative models does Mach33 have on satellite bandwidth?" or "What has the Mach33 newsletter covered over the last few weeks?" or "Has Mach33 written anything about SpaceX this quarter?"
visit the guide to set it up: https://research.33fg.com/mcp-guide
|
| Latest Analysis |
|
|
| Aug 26, 2026 |
|
SpaceX Louisiana and the Math Behind On-Site Propellant Infrastructure
|
|
SpaceXStarshipLaunchVertical Integration
|
|
Making Starship propellant on-site instead of buying it merchant cuts the bill from about $2.19 million to roughly $210,000 a flight, but the binding constraint is physical: merchant supply needs about 389 cryogenic tanker deliveries per launch, a pattern no road fleet sustains past the low hundreds of flights a year. That is why the $100 billion Louisiana campus puts propellant production and power generation on the site plan.
|
|
|
Model
Premium
|
|
The Propellant Bill
|
|
Prices a Starship flight's propellant merchant versus made on site, with power price as the lever, and sizes the truck, plant, and power constraint...
|
|
|
|
|
|
Read More →
|
|
|
| Industry News |
|
|
|
|
SpaceXAI announced Starbase, Louisiana on August 25, 2026, a $100 billion Starship launch campus on roughly 125,000 acres of former Exxon land at Pecan Island in Vermilion Parish. Construction is scheduled to begin in 2027 with a first launch targeted for 2029, and full buildout calls for five launch complexes sized to support thousands of launches a year.
Read More →
|
|
|
|
SpaceXAI launched 29 Starlink satellites from Space Launch Complex 40 at Cape Canaveral on August 25, 2026, the last planned Falcon 9 Starlink mission from Florida. Launch vice president Kiko Dontchev said Florida Starlink missions will fly on Starship from here on, while the West Coast team keeps launching Starlink on Falcon 9 from Vandenberg.
Read More →
|
|
|
|
Anthropic is reportedly preparing to match or exceed SpaceX's $86.2 billion record IPO size, with a public S-1 filing possible by end of August; the company confidentially filed a draft registration with the SEC. Along with this Anthropic announced a possible $30 Trillion total addressable market.
Read More →
|
|
|
|
NVIDIA announced on August 24, 2026 that SpaceXAI will deploy NVIDIA Vera CPUs to accelerate agentic AI workloads and expand Grok infrastructure on the Vera Rubin platform as it scales toward gigawatts of computing capacity. SpaceXAI's first-generation Starmind satellite is planned to run an optimized Vera Rubin NVL72 system.
Read More →
|
|
|
| Mach33 |
| The Space Finance Group |
|
|
|