Filter by Tags
Clear all
SpaceX (196)
Starlink (84)
Launch (65)
Regulatory (49)
DTC (34)
Blue Origin (33)
Politics (32)
AST Spacemobile (26)
Rocket Lab (25)
NASA (25)
Orbital Data Centers (23)
Defense (20)
Starship (20)
China (19)
Europe (18)
Broadband (15)
Cislunar (14)
xAI (11)
Military (11)
Space Stations (10)
Mars (10)
SpaceXAi (9)
IPO (9)
Amazon LEO (9)
Amazon Kuiper (8)
Iridium (7)
Space Situational Awareness (7)
In-Orbit Servicing (6)
ULA (6)
New Glenn (6)
Spectrum (5)
Firefly Aerospace (5)
Earth Observation (5)
EchoStar (4)
Globalstar (4)
Artemis II (4)
Falcon 9 (4)
U.S. Space Force (3)
NVIDIA (3)
Golden Dome (3)
Sierra Space (3)
ISRO (3)
Debris (3)
Northrop Grumman (3)
Terafab (3)
Valuation (3)
Eutelsat (3)
AI Chips (3)
Tesla (3)
Viasat (3)
Aetherflux (2)
Stoke Space (2)
York Space Systems (2)
Google (2)
Cursor (2)
Aviation (2)
Vast (2)
Verizon (2)
T-Mobile (2)
In Space Manufacturing (2)
Starcloud (2)
Moon Base (2)
Planet Labs (2)
Portal Space (2)
M&A (2)
Arianespace (2)
Ariane 6 (2)
Thales Alenia (2)
Russia (1)
Electromagnetic Launch (1)
Dragon (1)
IoT (1)
Grok (1)
Space Exploration (1)
Redwire (1)
Environment (1)
New Shepard (1)
Hypersonics (1)
Lockheed Martin (1)
HUMAIN (1)
Laser Comms (1)
CLPS (1)
Semiconductors (1)
Infrastructure (1)
rocket (1)
Cowboy Space (1)
ASML (1)
Shenlong (1)
Apex Space (1)
Starfall (1)
nebex (1)
google ventures (1)
fcc (1)
Inflight Wi-Fi (1)
legal (1)
Boeing (1)
Leonardo (1)
Japan (1)
Microsoft (1)
Galileo (1)
Solar Thermal Propulsion (1)
satellite licensing (1)
Stargaze (1)
Intuitive Machines (1)
K2 Space (1)
Africa (1)
fundraising (1)
Taiwan (1)
long march 10b (1)
Re-entry (1)
Cybercab (1)
Air Travel (1)
Voyager (1)
Inversion Space (1)
Starpath (1)
Long March (1)
Starbase (1)
Apollo (1)
Airbus (1)
-
NASA Plans $20 Billion Moon Base And Cancels Orbiting Lunar Station
NASA plans to allocate $20 billion for constructing a moon base and has decided to cancel the orbiting lunar space station (Gateway) under the Artemis program. The decision is confirmed as an agency policy shift.The plan includes development of nu...View Commentary -
NASA Lifts CLPS Contract Ceiling to $4.2 Billion to Support Lunar Lander Surge
NASA plans to raise the maximum value of its Commercial Lunar Payload Services programme from $2.6 billion to $4.2 billion, per a procurement filing posted to SAM.gov on April 27. The $1.6 billion uplift, a 62% increase, supports the higher roboti...View Commentary